Home Page   Contact Us   Site Map

Contact Information

Get Your Questions Answered

Call Jack Wool

757-619-6750

Marine Clean Safety & Prevention

P.O. Box 9707

Virginia Beach, Va. 23450

Your name
Your email

Contact MarineClean for Career Opportunities

Currently seeking professional firefighters for opportunities in Hampton Roads, VA.

Click here to contact us.

© Copyright 2024. Marine Clean. All Rights Reserved.
Rip Rap Construction

Rip Rap: New Installation riprapcon_3.jpg

The Marine Clean Safety & Prevention Team are Virginia Class “A” Marine Contractors. We have 20 years experience working with stone. All of our Rip Rap projects include quality workmanship and excellent customer service.

F.A.Q: Why would I choose a Rip Rap (Rock) revetment over a traditional timber Bulkhead?
Many of our clients ask the same question. The fact is that timber bulkheads are high maintenance waterfront structures. Years ago, creosote

There is not one single erosion control method that will perform well in every shoreline environment, so therefore each area must be assessed individually. Upon review, if your shoreline is favorable to a Rock Revetment, walls can be built by hand or mechanically placed. Rip Rap surfaces can be custom designed for a Smooth, Moderate or Jagged surface depending on our clients specifications. All projects include backer boards, fill, topsoil and professional landscape finishing behind your new Rip Rap wall.
riprapcon_4.jpg
Rip Rap Tip
Inspect your revetment regularly. Cavities and Erosion along the rock wall can cause dangerous sinkholes in your yard. Sinkholes warn that there may be a bigger problem below the surface. If cavities appear on either side of your revetment, call Marine Clean Safety & Prevention for a Free Professional Inspection and Estimate.

Maintenance Extends Life

Include this on all Maintenance tips.
Save thousands of dollars by acting soon. Repair’s often don’t need permits.
Rip Rap example. Bulkhead example catch it quick. City, army core, vmrc chesapeake bay board, (List all agencies) army core,
Key: drive urgency to get it fixed early, versus waiting for complete deterioration for permit. Move quick to save thousands.
riprapcon_7.jpg
Rip Rap Trivia
According to the United States Geological Survey, the total Rip Rap rock production in 2005 was 16.5 million tons.

Contact Us for FREE Estimate and Evaluation (click Here)
Call Jack at 757-619-6750 for a Free Estimate and Waterfront Structure Evaluation.

 trustworthy.jpgcapable.jpg  environmental.jpgexperience.jpg 
Home | ECO Docks | Hurricane Relief | Rip Rap Repair & Construction | Bulkhead Repair & Construction | Pier Repair & Installation | Boat Lift Repair & Installation | Cleaning & Maintenance | Sink Holes | Commercial Projects | Monthly Promotions | Government | About Us | Contact Us | Photos | Privacy Notice | News & Events